• Cabinetry
  • ViliMale
  • July 30, 2024
  • 28 Views

S3 Project 5 – Kitchen Remodelling

  • Freelancer Type Individual
  • Project Duration 1-3 Weeks
Araaby Ad 4

Description

Project Overview:

Transform your kitchen into a modern, functional, and stylish space with our comprehensive kitchen renovation services. Our goal is to create a kitchen that meets your needs and reflects your personal style. Here are the details of the tasks involved:

Scope of Work:

  1. Initial Consultation:

    • Discuss your vision, preferences, and budget.
    • Take measurements and assess the current layout and condition of the kitchen.
    • Provide design suggestions and layout options.
  2. Design and Planning:

    • Develop a detailed renovation plan, including layout, materials, and timeline.
    • Create 3D renderings to help visualize the new kitchen design.
    • Finalize design, materials, and budget with your approval.
  3. Demolition and Preparation:

    • Safely remove existing cabinets, countertops, appliances, and flooring.
    • Prepare the space for new installations, ensuring all surfaces are clean and ready.
  4. Electrical and Plumbing Work:

    • Update electrical wiring and outlets to meet current codes and accommodate new appliances.
    • Install new lighting fixtures, including task lighting, under-cabinet lighting, and ceiling lights.
    • Upgrade plumbing as needed, including new faucets, sinks, and pipes.
  5. Cabinetry and Storage Solutions:

    • Install custom or pre-fabricated cabinets, ensuring optimal storage solutions.
    • Add features such as pull-out shelves, lazy Susans, and soft-close drawers.
  6. Countertops and Backsplash:

    • Install new countertops in materials such as granite, quartz, or marble.
    • Add a stylish backsplash that complements the overall design.
  7. Appliance Installation:

    • Install new, energy-efficient appliances, including stove, oven, refrigerator, dishwasher, and microwave.
    • Ensure all appliances are properly connected and functioning.
  8. Flooring:

    • Install new flooring in materials such as tile, hardwood, or laminate.
    • Ensure the flooring is durable, easy to clean, and complements the overall kitchen design.
  9. Painting and Finishing Touches:

    • Paint the walls and ceiling with your chosen colors.
    • Add finishing touches such as trim, moldings, and hardware.
  10. Final Inspection and Cleanup:

    • Conduct a thorough inspection to ensure all work meets quality standards.
    • Clean the renovated kitchen, leaving it ready for use.

Skills Required

Carpentry

Project ID:RH-3843-lancer

Araaby Ad 3

Send Your Proposal

MVR
Days
  • Estimated Total Cost

    The total project cost.

    MVR55.00

  • Service Fee (5%)

    The service fee that will be deducted from your proposed amount.

  • Your Earning

    Total amount you will earn.

  • Stick this Proposal to the Top

    The sticky proposal will always be displayed on top of all the proposals.

  • MVR12.00
  • Make Sealed Proposal

    The sealed proposal will be sent to the project author only it will not be visible publically.

  • MVR7.00
  • Featured Proposal

    The featured proposal will have a distinctive color and popped up between other proposals to get the author's attention.

  • MVR5.00
I agree to the terms and conditions
Budget
MVR55.00
Fixed

956 Days left

S3 @s3

Member since July 31, 2022
View Profile

About The Employer

  • Maldives
  • 0 Projects completed
  • Payment Method
  • Email Verified
Araaby Ad 2

More from S3 @s3

Report Project